top of page
Search
All Posts


Project Spotlight: St. Andrew’s Primary School Upgrade
We’re pleased to share that we have been awarded the project for the refurbishment and upgrade of St Andrew's C of E Primary School. This project involves modernising the school’s systems to meet BB101 current standard for ventilation, thermal comfort, and indoor air quality in schools.


EV Charging Considerations
Installing EV chargers requires careful consideration of both infrastructure demands and financial viability. The type and number of chargers, whether slow, fast, or rapid, not only determine the level of convenience for users but also directly influence the scale of the required electrical infrastructure.Â


Encouraging Smarter Energy Use in Buildings
Reducing the energy consumption of buildings such as homes, offices, schools and shops requires more than just upgrading insulation or installing renewable energy systems. One of the most important and often overlooked aspects of energy efficiency is how people use energy in the first place.Â


Health And Comfort: School Updates
We have been working on a preparatory school in Manchester, carrying out a survey and condition report on the mechanical HVAC and electrical small power and lighting systems, including all heating, ventilation, air conditioning, distribution boards, and other electrical circuits within the school, along with the condition of the boiler, radiators, and related equipment.Â
bottom of page